200k – Morro Bay Almost Tepusquet

Morro Bay Almost Tepusquet  200k  (ACP Brevet / Route # 3108)

Brevet Registration             Registered Riders

Ride Start:  SATURDAY, Feb 15 at 0600
Ride End:  Feb 15 at 1930
Time Limit: 13.5 hours

Up to date info:  SLORando Google Group

Cost: $15.00
Registration:  Closes Thursday midnight before ride

Start Location:  Morro Bay, CA
Description: A shorter 200k route that follows most of the 300k routes that are run on the same day..  Begins in Morro Bay heads down to Foxen Canyon via Santa Maria with a loop out to Garey before returning to Morro Bay via SLO.  The 200k follows the 300k route for the first 93km, reconnecting in Orcutt but then they split again as the 300k does the big climb. The routes rejoin at Garey and then are mostly together for last 95km back though Santa Maria/SLO to Morro Bay except the 300k goes up to Lopez Lake.

please use Google Group SLORando for general questions or email SLO RBA